Linyi Qiangsheng Tools Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Liu Ziqiang
  • Company Name : Linyi Qiangsheng Tools Co., Ltd.
  • Tel : 86-0539-8381788
  • Fax : 86-0539-8381999
  • Address : Shandong,Linyi,8 Renmin Road, Hedong District, Linyi City, Shandong Province. China
  • Country/Region : China
  • Zip : 276034

formwork Mason/H-T frame

formwork Mason/H-T frame
Product Detailed
Related Categories:Scaffoldings
formwork/Mason/H-T frame. Features: 1) Material grade: Q235, SM490 2) Sizes: 914mm x 914mm, 914mm x 1,524mm, 914mm x 1,829mm,

Formwork/Facade/Mason/H-T frame

1:Steel-frame scaffolding

2:Swivel 8 inch caster with brakes

3:Adjustable

4:Fold easily for storage

5:400-pound capacity

1.Frame size:1219*1700/490/914/1524/1930mm etc

2:Cross brace: 2198/2045/1928/1850mm etc

3.U-head jack base: 750/700/600/500/400/300mm etc

4.Screw jack base:  750/700/600/500/400/300mm etc

5.Mesh plank: 500*1829mm,400*2000mm,400*1800mm,400*2500mm etc

6. One set of frame including:

  A:2 units of mason frame

  B:4 units of coupler pin

  C:2 units of cross brace

  D:1 units of mesh plank

7:powder coated or galvanized finish

8:made of high strength steel

9:package: 600sets/40HQ

Frame scaffolding:

components of assembling

1.wooden planks-

clean site and lay the wooden planks at the ground in horizontal position.

2.jack base-

it is a base seat for adjusting and fixing the required scaffolding length above the wooden planks.

3.Main frame-

insert the main frame into jack base section in per pendicular position.

4.cross brace-

for fixing the main frame in each span of scafolding.

5.joint pin-

insert into the top of main frame for joining the required dimension.

6.horizontal frame or catwalk(steel scaffolding plank)-

it is a lateral pipe for frmaes used for fixing the main frame to complete the first floor scaffolding.(it can be erected with about 2 to 4 spans in each high rising floor alternately)

7.Wall tie(keeper joint)-

use wall tie to prevent the frames from swaying down due to strong wind and unstable ground. Fasten the ties to walls every 4 span horizontally and every 4 frame , vertically.

Our advantage:

1:years experince in steel structure field

2:we can provide any items according to your buliding requirment

3:we can design and manufacture according to your specirfic requirment

4:best possible service

5:OEM service is available

If you have any inquiry or question for our products please do not hesitate contact with us directly.

formwork Mason/H-T frame



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.